Equipment Health IndexDemo data: fictional plants, real part numbers

Where the numbers come from

Every headline number, its source, and how strong the evidence is. We say what's measured and what's an estimate.

measuredreal datasurveyvendorestimatemodelvendor = a company that sells a related product · model = our own calculation

The problem: is it big?

~$1.4T / yr, 11% of revenueUnplanned downtime cost at the world's 500 largest companiesSiemens, True Cost of Downtime 2024 (181 interviews, extrapolated)vendor
44% monthly, 14% weeklyPlants with equipment-related interruptions at least that oftenABB / Sapio Research 2025, n = 3,600survey
52%Smaller US manufacturers (< $500M) saying downtime costs ≥ $50k per hourSimuTech 2025, n = 200survey
83% (699 of 843)Automation assets discontinued or end-of-life in one real plant auditSiemens obsolescence audit case, 2025 (one plant, not a national rate)vendor
Only 55%Plants with a proactive plan to manage obsolete componentsABB 2025survey
9.2 yearsAverage age of equipment in US durable-goods factories, oldest since 2011Federal Reserve / BEA data via Silverado Policy Acceleratormeasured
PLCs 10–24 wks, drives 12–26 wksLead times for new automation hardwareDistributor planning ranges, Q1 2026vendor

The market: how many customers?

25,799US manufacturing plants with 100+ employees (8,992 with 250+)US Census County Business Patterns 2022, NAICS 31-33measured
1,667US manufacturing acquisitions in 2024Travelers / PitchBookmeasured
~670 / yr (450–900)Of those, deals that get an equipment or controls reviewVelocity model on the deal count (no body publishes this)estimate
67.1%Share of US mid-market PE deals that are add-ons (each brings a new plant register)PitchBook, Q3 2026 US PE Middle Market Reportmeasured
32,000 · $3.8TUnsold PE-backed companies worldwide (the liquidity squeeze)Bain, Global Private Equity Report 2026measured
~$93BUS maintenance, repair and operations (MRO) spend, 2025: the pool savings come fromMordor Intelligence (market estimate; definitions vary)estimate
22%MRO inventory unused for 5+ yearsSPARETECH survey of 300 manufacturing executivessurvey

Today's alternatives: what they cost

~64 h, ~$12.8kOn-site machinery appraisal, mid-market plant; photo capture saves only 2–5 hVelocity model from published appraisal fees and practitioner examplesestimate
~104 h, ~$20kControls / obsolescence assessment; photo ID + lifecycle lookup saves 9–34 hVelocity model; anchors: distributor IBE $5–15k, Avanceon $15k fixed fee, Siemens $290–341/hestimate
~45 engagements / yrConsulting-firm breakeven for an expert-reviewed assessment tool ($15k fee uplift)Velocity model ($600k build, $250k/yr to run)model

What plants already know about their parts (data collection)

Velocity-powered research, US plants with 100–1,000 employees. No survey measures these directly, so each is a range (low / base / high).

60% (45–75%)Plants using a maintenance system (CMMS) for at least some recordsVelocity research, anchored to Plant Engineering maintenance surveys (53% in 2018, 61% in 2019)survey
15% (5–30%)Of those, plants keeping part-level records with install dates (the rest track whole machines)Velocity research estimate; no representative survey exists. Supported by Emerson field visits: only 'a handful' of plants had complete parts listsestimate
25% (10–45%)Installed drives that can report their own fan / capacitor lifeVelocity research estimate from Rockwell, ABB and Siemens product documentationestimate
12% (5–25%)Plants that actually use that built-in diagnostic data for maintenanceVelocity research estimate; MaintainX 2026 survey: 31% do condition-based maintenance (a broader practice)estimate
~28% of partsParts with a usable install record in a typical plant: 60% × (15% × 70% complete + 85% × 60% original part × 70% complete) = 6% part records + 21% machine recordsOur formula on the Velocity numbers above. Completeness (70%, from a measured study where record fields went from 20% to 90% filled) and original-part share (60%) are our assumptionsmodel

Plant economics (inputs to the price model)

Values for a ~170-person plant (100–249 employee band), scaled by headcount in the demo.

$1.05M / yrMaintenance budgetVelocity #1 (benchmarks: maintenance as % of replacement asset value)estimate
$0.37MSpare-parts inventory on the shelfVelocity #1estimate
12–30% / yrCarrying cost of spares (cash part only 3.5–8%)Velocity #2estimate
~$20k / yrRush / expedite premiumsVelocity #3 (one vendor case + survey anchors)estimate
$300–1,840 / plant / yrOur cost to serve (image recognition API + human review)Velocity #18 at claude-sonnet-5-5 pricesestimate

Our results on the demo

Plants and companies are fictional. Part numbers, lifecycle statuses and marketplace listings are real.

127 / 129Part numbers read exactly by image recognition (the 2 misses were cut-off labels, flagged, not guessed)Measured on rendered test photos of real part labelsmeasured
100% precision · 98% recallParts matched to the right catalog entry; 112 / 112 auto-accepted parts correctMeasured against the demo's planted answer keymeasured
30 partsLifecycle status (active / end-of-life / discontinued) with date and successorManufacturer lifecycle pages: Rockwell, Siemens, ABB, Mitsubishi (each part links its source)real data
42 listingsReal marketplace prices for 6 parts (e.g. refurbished Kinetix 6000 $4.3–6.5k)Hand-collected Nov 14, 2026 from eBay (sold), Radwell, DO Supply; screenshots in the reporeal data
~$9.7k / plant / yrRegistry subscription: a fixed yearly fee, tiered by the number of critical parts ($4–10k across the demo plants; Toledo ~$9.7k), plus $1–2k one-time onboarding and a monthly fee per sensor point (price to set). Never a share of savingsOur money model (xray/pricing.py sets the tier amounts); every input labeled in xray/params.pymodel
176 h → 40 h · ~$84k at stakeOne event: Toledo's Line 2 servo drive fails. Worst-case outage without and with the Fort Wayne shelf spare (at stake: $5–249k)Our model: outage capped at 10–25 operating days, 40–80% of lost output counted (both assumptions)model
~$77k / yrDowntime avoided at Toledo, expected (range $12–205k; ~$232k over 3 years; $622k of output at stake). Shown separately, never in the price, never scaled up to the whole plantOur model: only the spare rescues we found; each part's chance of failing comes from its health score (1 − health/100 per year), one failure per spare within 3 years, discounted at 10%model
$429k cut + ~$1.7M holdbackTillman deal view: overdue spending the buyer inherits ($79k control parts + $350k for 6 machines at end of life); holdback at a 10% discount rateOur model; discount rate per Damodaran Jan 2026, escrow norms per SRS Acquiom 2025model

Full research and citations: docs/research/market-validation.md, deep-dive-numbers.md and velocity.md in the repo.